Sales Contract

Contract No: 20060835


Execution Place: The place in Nanjing where the Seller is located
Execution Date: August 31, 2006  
Seller: CEEG (Nanjing) PV-Tech Co., Ltd.  Buyer: CEEG Nanjing International Trade Co., Ltd.
Legal representative: TingXiu Lu  Legal representative:
Add.: 123 Focheng West Road, Jiangning Economic & Technical Development Zone, Nanjing  Add.:
Postcode: 211000  Postcode:

Opening bank: Nanjing Commercial Bank

HuaQiao Road Sub-branch

  Opening bank:
Accounts: 01460120180000051  Accounts:
Tel: 025-52766648  Tel:
Fax:025-52766882  Fax: 025-83275377

The Parties hereby agree to trade the following products, and conclude the terms and conditions as follows:


Description

  Specifications Quantity  Unit  Unit price  Total Amount

Mono-crystalline TDB 125

  125*125S
Eff.:15.5%
 50,000 pcs
(115141.75W
 
)
 Watt  RMB
32.50/W
  3742106.88

Multi-crystalline TDB 156

  156*156M
Eff.:14.5%
 50,000 pcs
(176436.00W
 
)
 Watt  RMB
32.50/W
  5734170.00

Total Amount (in word):

 RMB Nine Million Four Hundred and Seventy
Six Thousand Two Hundred and Seventy Six
Point Eighty Eight (RMB 9476276.88)

The above prices include 17% value added tax.

1. The Seller shall mark the detailed efficiency and batches of the cell. The Parties shall settle the payment in accordance with the actual solar power efficiency actually delivered, with the above fixed unit price.

2. Quality Requirement and Technical Standard: The cells provided by the Seller shall comply with the national standard GB12632-90. The Parties agreed that the consumption allowed during the transportation of the cell shall be 0.5%. In the event the thickness of the cell is less than or equal to 220µm, the broken rate allowed during the process of the cells shall be 1.8%. The Seller shall replace any further broken cells, and shall assume correct transport and handling on the further delivered cells in accordance with the stipulations herein.

Cells acceptable:

- The depth shall not be more than 1mm and the width not more than 1.5mm (with a maximum number of 2 per solar cell).

- Or the depth shall not be more than 1mm and the width not more than 3mm (1 per solar cell).

- Slight color difference is allowed between each solar cell. The efficiency tolerance of the cells after tested many times: ±5%.

3. Criterion and Method of Inspection and Acceptance and Term of Claims: The Buyer shall inspect the goods according to the detailed specifications of each installment. The term of claims shall be within one week after the Buyer receives the goods.

4. Packing Requirement: The cells shall be packed in cartons that are suitable for highway transportation to satisfy the requirements for long distance transportation for a long time.


5. Destination of Delivery: The place where the Seller is located. The Buyer shall bear the fees for transportation and insurance if it asks the Seller to deliver the goods. Simultaneously, the Seller shall not be responsible for the breakage less than 0.5% during the transportation.

6. Form of Payment Settlement: The Buyer will remit 100% of the Contract value to the account designated by the Seller within one working day upon the execution of the Contract.

7. Term of Delivery: Upon receipt of 100% of the price value paid by the Buyer, the Seller shall deliver 50,000 pieces of Mono-crystalline 125 wafers before September 5th and 50,000 pieces of Multi-crystalline 156 wafers before September 15.

8. The Bill of Documents to be Provided by the Seller: The Seller shall submit the value added tax invoice to the Buyer within 10 days after the delivery of goods.

9. Force Majeure: Neither of the contractual Parties shall be liable for not fulfilling the obligations hereunder as a result of natural disasters, war, government interference or other events unforeseeable, unavoidable and insuperable by the Parties. However, the Parties shall provide within 7 days the valid documentary evidence issued by the notary department of the place where the force majeure event occurs.

10. Settlement of Disputes: All disputes arising from this Contract shall be settled through consultation by both Parties. In case no settlement can be reached through consultation, the Parties may file the dispute to the local court where this Contract is executed.

11. This Contract shall come into effect upon the execution of the Parties and the copies executed and delivered through telefax shall be as valid as the original.


The Seller: (Seal)  The Buyer: (Seal)
Entrusted Representative: /s/  Entrusted Representative:
(Signature)  (Signature)
Date:  Date: