                                    AMENDMENT

                                     TO THE

                SATELLITE PURCHASE CONTRACT FOR IN-ORBIT DELIVERY

                                     BETWEEN
                             XM SATELLITE RADIO INC.

                                       AND

                            BOEING SATELLITE SYSTEMS
                               INTERNATIONAL, INC.




                              CONTRACT NUMBER L0634



<Page>

                                    AMENDMENT
                                     TO THE
                SATELLITE PURCHASE CONTRACT FOR IN-ORBIT DELIVERY

This Amendment (the "December Amendment") to the Satellite Purchase Contract for
In-Orbit Delivery effective March 23, 1998 as amended, restated, superseded
and/or supplemented from time to time and in effect through and including the
date hereof (the "Contract") is made this ___ day of December 2001 by and
between XM SATELLITE RADIO INC., a Delaware corporation with its principal
offices located at 1500 Eckington Place, N.E. Washington DC 20002 (hereinafter
"Customer" or "XM") and BOEING SATELLITE SYSTEMS INTERNATIONAL, INC., a Delaware
corporation with its principal offices located at 2260 E. Imperial Highway, El
Segundo, California 90245 (hereinafter "Contractor" or "BSSI"). Capitalized
terms used but not otherwise defined in this December Amendment shall have the
respective meanings as set forth in the Contract.

WHEREAS, the Parties entered into and executed the Contract, which Contract
provides for the procurement by Customer from Contractor of three (3) Boeing 702
Satellites, two (2) of which have been delivered in-orbit and one (1) of which
is being constructed as a ground spare, together with related items, services
and activities; and

WHEREAS, Boeing Capital Services Corporation ("BCSC"), an affiliate of
Contractor, has agreed to provide debt financing to Customer and its affiliates
pursuant to certain financing documents and agreements of even date herewith,
namely, (i) Customer Credit Agreement between BCSC and XM Satellite Radio
Holdings Inc. ("Holdings"); (ii) Assignment and Novation Agreement (the
"Assignment Agreement") between XM and XM Holdings Inc. ("Holdings"); and (iii)
Security Agreement between BCSC and Holdings; and

WHEREAS, in connection with the aforementioned financing arrangements, Customer
and Contractor have agreed to amend the Contract as is more fully set forth
herein with the understanding that all such aforementioned financing documents
and agreements shall be executed concurrently; and

WHEREAS, in order to facilitate the aforementioned financing arrangements,
Customer has agreed to assign all of its rights, title and interest under the
Contract relating to the Ground Spare Satellite Bus (as defined below) to
Holdings, the parent company of XM Satellite Radio Inc., and Contractor
has agreed to consent to such assignment; and

WHEREAS, pursuant to the Assignment Agreement, references to "Customer" in the
Contract shall refer to Holdings, to the extent relating to the rights, duties
and obligations relating to the Ground Spare Satellite Bus (including all
deferred and incentive payments relating to the Ground Spare Satellite), and
otherwise to XM Satellite Radio Inc.

                                       1

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

NOW, THEREFORE, in consideration of the mutual benefits to be derived, the
Parties hereto agree that the Contract is amended as follows:

1.   AMENDMENT OF ARTICLE 1.1 (CERTAIN DEFINITIONS). Article 1.1 is hereby
     amended by inserting the following new definitions in alphabetical order
     and re-lettering the rest of the definitions accordingly.

         "BCSC" means Boeing Capital Services Corporation, a Delaware
         corporation.

         "CUSTOMER CREDIT AGREEMENT" means that certain Customer Credit
         Agreement dated as of December __, 2001 by and between XM Satellite
         Radio Holdings Inc., a Delaware corporation and BCSC.

         "DECEMBER AMENDMENT" means the Amendment made December __, 2001 to the
         Satellite Purchase Contract for In-Orbit Delivery by and between XM
         Satellite Radio Inc. and Contractor.

         "DEFERRED CALL-UP" means, following the written notice by Customer to
         Contractor no later than [***] to defer completion and store the
         unfinished (not yet Available for Shipment) Ground Spare Satellite
         for a period extending beyond the Scheduled Ground Spare Available for
         Shipment Date, the written notice by Customer to Contractor to proceed
         with the Work required to make the Ground Spare Satellite Available for
         Shipment."

         "DEFERRED PAYMENT DATE" means December ___, 2006."

         "GROUND SPARE SATELLITE BUS" means the Ground Spare Satellite, except
         for the Ground Spare Satellite Payload.

         "GROUND SPARE SATELLITE PAYLOAD" means the following components of the
         Ground Spare Satellite:

               (i)  all hardware above the four-point interface above the bus
                    module; and

               (ii) all antenna structures, deployment mechanisms and
                    reflectors.

         "SCHEDULED GROUND SPARE AVAILABLE FOR SHIPMENT DATE" means, solely with
         respect to the Ground Spare Satellite, [***]."

2.   CONSENT TO CERTAIN SECURITY INTERESTS AND AMENDMENT OF ARTICLE 5.7
     (SECURITY INTEREST). Add a new paragraph (f) to Article 5.7 as follows:

         "(f) Notwithstanding Article 5.7(a), Contractor and Customer hereby
         consent to the granting by Contractor and Customer of a security
         interest in any right, title or interest Contractor or Customer (as the
         case may be) may have in the Ground Spare Satellite Bus in favor of
         BCSC; and Contractor and Customer agree that BCSC's rights in the
         Ground Spare Satellite Bus shall have priority over any and all rights
         that Contractor and Customer may have in such Ground Spare Satellite
         Bus. Contractor and Customer confirm that Article 5.7(d) shall not
         apply to the Ground Spare Satellite Bus and that the

                                       2

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

         release and termination of the security interest as set forth in
         Article 5.7(c)(3) shall have no effect on the priority of BCSC's
         security interest consented to by Contractor and Customer in
         accordance with this Article 5.7(f)."

3.   AMENDMENT OF ARTICLE 5.8(b). Article 5.8(b) is hereby amended and restated
     in its entirety as set forth below (the interest rate set forth in Article
     5.8(c) shall be applicable to Article 5.8, as amended):

         "Contractor shall provide [***] with interest payable on this amount
         to commence quarterly in arrears from the date that the Ground Spare
         Satellite is Available for Shipment and ending on the Deferred
         Payment Date, with the principal of such amount to be paid on such
         Deferred Payment Date, all in accordance with Exhibit G-2; provided
         that if prior to completion Customer has decided to store the
         unfinished (not yet Available for Shipment) Ground Spare Satellite
         for a period extending beyond the Scheduled Ground Spare Available
         for Shipment Date, such interest shall commence on the Scheduled
         Ground Spare Available for Shipment Date; PROVIDED FURTHER that such
         interest shall be tolled on a day-for-day basis to the extent the
         Ground Spare Satellite is not in fact Available for Shipment [***]
         after Deferred Call-up such that no interest shall be payable during
         such tolled period. Subject to such rights as shall have been
         established by Customer and consented to by Contractor in favor of
         BCSC, Contractor shall retain title to, and store (in accordance
         with Article 14.4 (Storage)), the Ground Spare Satellite prior to
         (i) Launch or (ii) other disposition by Customer and repayment of
         principal by Customer or its Affiliates of amounts owing to
         Contractor or to BCSC under the Customer Credit Agreement.

4.   AMENDMENT OF ARTICLE 9.1. Article 9.1 is hereby amended by adding the
     following proviso at the end thereof:

         "; provided that notwithstanding any other provision in the Contract,
         transfer of title of the Ground Spare Satellite Bus shall only occur
         after all amounts owing to BCSC are repaid under the Customer Credit
         Agreement."

5.   AMENDMENT OF TABLE 7.1; CLARIFICATION OF DELIVERY DATE OF GROUND SPARE.
     Customer and Contractor confirm that the Ground Spare Satellite shall be
     Available for Shipment on [***]. Accordingly, the box in the second
     column of row number 7 of Table 7.1 of the Contract is hereby deleted in
     its entirety and the following is substituted therefor along with a
     footnote asterisk****:

         "Available for Shipment on [***]; unless the Ground Spare Satellite
         is placed into Storage at the request of Customer, in which case
         the Ground Spare Satellite shall be Available for Shipment [***]
         after Deferred Call-up. ****.

         **** Customer shall notify Contractor in writing by no later than
         [***] to defer completion of, and store the unfinished (not yet
         Available for Shipment) Ground

                                       3

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

         Spare Satellite for a period beyond the Scheduled Ground Spare
         Available for Shipment Date. For the avoidance of doubt, where the
         completed Ground Spare Satellite is stored after it becomes Available
         for Shipment, the provisions of Section 4.6 of Exhibit D (Test Plan
         Requirements) shall control the retesting and qualification of the
         Ground Spare Satellite for launch."

6.   WAIVER OF CERTAIN LIQUIDATED DAMAGES; COVENANT NOT TO TERMINATE FOR BREACH.
     The Contract shall be amended by adding a new Article 36 (Waiver of Certain
     Liquidated Damages; Covenant not to Terminate for Breach) as follows:

         "36.1    WAIVER OF CERTAIN LIQUIDATED DAMAGES.

         Notwithstanding Article 10 (Liquidated Damages for Late Delivery)
         and Article 28 (Launch Services), Customer hereby irrevocably waives
         its rights to liquidated damages under the Contract with respect to
         any failure by Contractor [***]; provided, however, that the
         foregoing waiver shall not apply to, and liquidated damages may be
         imposed under [***] with respect to, Contractor's obligation to
         cause the Ground Spare Satellite to be Available for Shipment by the
         date set forth in Table 7.1 of the Contract, as modified by the
         December Amendment.

         36.2     WAIVER OF AND COVENANT NOT TO TERMINATE FOR BREACH.

         Customer hereby irrevocably waives any right it may have under the
         Contract and covenants that it shall not terminate the Contract for any
         breach arising out of [***]."

7.   AMENDMENT OF ARTICLE 12.6. Article 12.6 is hereby amended by the addition
     of the following Article 12.6 (c) thereto:

         "(c) Notwithstanding Article 12.6(b), [***] of the Total Amount at
         Risk for the first two Satellites [***] (such portion, the "BSSI
         Portion") shall be payable on the Deferred Payment Date, said amount
         to be reduced by any amounts Contractor failed to earn prior to the
         Deferred Payment Date in accordance with Article 12. Customer shall
         pay to Contractor interest on earned amounts as set forth in Exhibit
         G-1 (calculated at a rate of [***] compounded annually) which shall
         be payable quarterly in arrears, all commencing with the Initial
         Handover Date of 15 May 2001 for the first Satellite ("XM-Rock")
         and, all commencing with the Initial Handover Date of 28 June 2001
         for the second Satellite ("XM-Roll") as set forth in Exhibit G-1.
         After the Deferred Payment Date, unearned Incentive Amounts shall be
         repaid by Contractor to Customer as follows:

                                       4

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

         (i)  Contractor shall earn such Incentive Amounts in accordance with
              Article 12.3 (Calculation and Earning of Incentive Amounts); and

         (ii) any Incentive Amounts not earned (or not earnable in the event of
              a Partial Loss or a Constructive Total Loss of a Satellite) by
              Contractor pursuant to Article 12.3 (Calculation and Earning of
              Incentive Amounts) shall be repaid by Contractor to Customer as
              set forth below and as listed in Exhibit G-1. Repayment by
              Contractor of any unearned or not earnable Incentive Amounts
              under this paragraph (c) shall be due and payable thirty (30)
              Calendar Days after the date of receipt by Contractor of a
              telefaxed invoice (which shall be followed by the airmailed
              original) from Customer. Customer's invoice shall be accompanied
              by sufficient information to support Customer's claim. Contractor
              shall be deemed to have accepted the invoice ten (10) Business
              Days after receipt of Customer's invoice unless, within such time
              period, Contractor notifies Customer of a dispute. Any disputes
              as to the performance of a Launched Satellite shall be resolved
              in accordance with the provisions of Article 12.4 (Disputed
              Performance). Contractor shall pay any undisputed portion of an
              invoice.


         The amount of [***] ([***] less the [***] of incentives), or [***]
         for each of the first two Satellites [***], shall be earned by and
         paid to Contractor in accordance with Article 12.3, Article 12.6 and
         as set forth in Exhibit G-1."

8.   AMENDMENT OF ARTICLE 14.4(c). Article 14.4(c) is hereby amended by the
     addition of the following sentences at the end thereof:

         "Such costs shall accrue quarterly beginning on either (i) the later of
         the date on which the Ground Spare Satellite is actually Available for
         Shipment or the delivery date of the Ground Spare Satellite set forth
         in Table 7.1 hereof or (ii) the Scheduled Ground Spare Available for
         Shipment Date (solely in the event Customer elects to store the
         unfinished (not Available for Shipment) Ground Spare Satellite for a
         period extending beyond the Scheduled Ground Spare Available for
         Shipment Date), and shall be payable on the Deferred Payment Date.
         Contractor shall provide a statement to Customer for the storage costs
         incurred for each quarter and Customer shall pay quarterly installments
         of interest only with respect to the accrued but unpaid storage costs.
         Such quarterly installments of interest, payable in arrears, shall be
         calculated at a rate equal to [***] compounded annually, computed
         beginning on the date that the applicable storage costs accrue, and
         continuing until payment of the accrued storage costs on the
         Deferred Payment Date."

9.   AMENDMENT OF ARTICLE 14.4(e). Article 14.4(e) is hereby amended by the
     addition of the following sentences at the end thereof.

         "Notwithstanding the above, [***] after either (i) the later of the
         date on which the Ground Spare Satellite is actually Available for
         Shipment or the delivery date of the Ground Spare Satellite set
         forth in Table 7.1 hereof or (ii) the Scheduled Ground

                                       5

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

         Spare Available for Shipment Date (solely in the event Customer
         elects to store the unfinished (not Available for Shipment) Ground
         Spare Satellite for a period extending beyond the Scheduled Ground
         Spare Available for Shipment Date), Customer shall pay to Contractor
         [***] of the Incentive Amount for the Ground Spare Satellite of [***]
         (subject to repayment pursuant to this Article 14.4(e)) and
         Contractor shall be entitled to receive interest beginning upon such
         date on the balance of the Incentive Amount of [***] (calculated at a
         rate of [***]) which shall be payable quarterly in arrears in
         accordance with Exhibit G-2. Customer shall pay to Contractor [***]
         on the Deferred Payment Date.

         If the Ground Spare Satellite is launched prior to the Deferred Payment
         Date, one of the following actions shall be taken, and in either case,
         the principal amount of $[***] (said amount to be reduced by any
         amounts Contractor failed to earn prior to the Deferred Payment Date in
         accordance with Article 12) shall be paid on the Deferred Payment Date
         and, for the avoidance of doubt, all amounts owed to BCSC shall have
         been paid in full under the Customer Credit Agreement.

                  (1)      If Deferred Call-up of the Ground Spare Satellite
                           occurs within [***] from the Scheduled Ground
                           Spare Available for Shipment Date (or such later
                           date on which the Ground Spare Satellite actually
                           becomes Available for Shipment where the delay in
                           availability is due to Contractor), Customer shall
                           begin to pay to Contractor interest on earned
                           amounts as set forth in Exhibit G-2 (calculated at
                           a rate of [***] which shall be payable quarterly
                           in arrears), all commencing with the Initial
                           Handover date of the Ground Spare Satellite;
                           provided, if the Ground Spare Satellite is used as
                           a replacement satellite, Customer shall have no
                           obligation to pay any of the [***] or any of the
                           [***] in In-Orbit Performance Incentives or
                           interest thereon (and any of such amounts already
                           paid shall be refunded to Customer within [***] of
                           Customer's invoice); provided that such interest
                           shall be tolled on a day-for-day basis to the
                           extent the Ground Spare Satellite is not in fact
                           Available for Shipment [***] after Deferred
                           Call-up; or

                  (2)      If Deferred Call-up of the Ground Spare Satellite
                           occurs after [***] from the Scheduled Ground Spare
                           Available for Shipment Date (or such later date on
                           which the Ground Spare Satellite actually becomes
                           Available for Shipment where the delay in
                           availability is due to Contractor), interest shall
                           commence [***] after the Scheduled Ground Spare
                           Available for Shipment Date on the amount of [***],
                           payable quarterly in arrears (calculated at a
                           rate of [***] compounded annually) until the
                           Deferred Payment Date; provided, if the Ground
                           Spare Satellite is used as a replacement
                           satellite, Customer shall have no obligation to
                           pay any of the [***] or any of

                                       6

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

                           the [***] in In-Orbit Performance Incentives or
                           interest thereon (and any of such amounts already
                           paid shall be refunded to Customer within [***] of
                           Customer's invoice); provided that such interest
                           shall be tolled on a day-for-day basis to the
                           extent the Ground Spare Satellite is not in fact
                           Available for Shipment [***] after Deferred
                           Call-up.

     After the Incentive Amount of [***] has been paid on the Deferred
     Payment Date, unearned Incentive Amounts for the Ground Spare Satellite
     shall be repaid by Contractor to Customer in accordance with the procedure
     set forth as stated above in this Article 14.4(e).

     If the Ground Spare Satellite has not been launched prior to the
     Deferred Payment Date, the [***] of the Incentive Amount shall be paid
     to Contractor on the Deferred Payment Date, and Contractor shall be
     entitled to retain the full Incentive Amounts for the Ground Spare
     Satellite and neither Party shall have any further obligation to each
     other except with respect to delivery of the Ground Spare Satellite to
     storage in accordance with Paragraph (g) below and title shall pass to
     Customer in accordance with Paragraph (h) below."

10.  AMENDMENT OF ARTICLE 14.4(g). Article 14.4(g) is hereby revised by adding
     the following sentences at the end thereof:

     "Notwithstanding the foregoing, in the event the Ground Spare Satellite
     has been in such storage for [***] following the later of the Scheduled
     Ground Spare Available for Shipment Date or the date the Ground Spare
     Satellite actually becomes Available for Shipment, as the case may be,
     or Customer decides prior to the end of such [***] period not to Launch
     such Satellite, the following shall apply:

               (i)  Contractor shall be entitled to receive, within [***]
                    after the earlier of receipt of de-storage notification
                    from Customer or the end of the [***] period, all payments
                    due and owing and not otherwise paid to Contractor
                    pursuant to Paragraph (e) above, with the exception of
                    the [***] pursuant to Article 5.8 (Payment and Deferred
                    Financing for the Ground Spare Satellite), the [***] of
                    the Incentive Amount pursuant to Article 14.4(e) above,
                    and the storage costs deferred pursuant to Article
                    14.4(c).

               (ii) Contractor shall promptly Deliver such Satellite, at
                    Customer's expense, to a storage location specified by
                    Customer in the State of Florida or the State of Delaware,
                    or in such other location as may be mutually agreed upon by
                    the Parties. Customer's expenses shall include any
                    applicable state sales tax for such storage.

              (iii) Title to the Ground Spare Satellite shall pass to Customer
                    on the later of such time that Customer has (x) paid to
                    Contractor the Deferred Financing

                                       7

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

                    Payment of [***], the Incentive Amounts of [***] and the
                    storage costs deferred pursuant to Article 14.4(c), as
                    applicable, and (y) paid all amounts owing to BCSC in
                    accordance with the Customer Credit Agreement."

11.  AMENDMENT OF ARTICLE 14.4(h). Article 14.4 (h) is hereby revised by adding
     the following sentence as follows:

         "If the Ground Spare Satellite is placed in storage in accordance with
         Article 14.4(g) and Final Acceptance has not taken place pursuant to
         Article 8.6, (i) Final Acceptance shall occur with respect to the
         Ground Spare Satellite upon arrival of the Ground Spare Satellite at
         the storage location specified by Customer, in which case,
         notwithstanding Article 4.3 (Taxes and Duties), any and all taxes and
         duties in connection with such delivery shall be borne and paid by
         Customer, and (ii) notwithstanding Article 9.1, transfer of title with
         respect to the Ground Spare Satellite placed into storage shall occur
         as set forth in Article 14.4(g)(iii). Risk of Loss with respect to the
         Ground Spare Satellite shall transfer to Customer upon arrival of the
         Ground Spare Satellite at the storage location specified by Customer."

12.  AMENDMENT OF ARTICLE 25 (INSURANCE). (a) Article 25 is hereby amended by
     inserting the following sentence at the end of Article 25.1(a):

         "Customer shall procure at its own expense and maintain in full force
         and effect, at all times from and after the time when risk of loss or
         damage to the Ground Spare Satellite is transferred to the Customer and
         prior to the launch of the Ground Spare Satellite in accordance with
         the terms of this Contract, Ground Insurance with respect to the Ground
         Spare Satellite in a minimum amount equal to the sum of (i) the Minimum
         Threshold Amount (as such term is defined in the Customer Credit
         Agreement, and solely to the extent required under the Customer Credit
         Agreement) and (ii) all deferred financing, milestone payment amounts
         and Incentive Amounts relating to the Ground Spare Satellite, to the
         extent Customer owes such deferred financing, milestone payment amounts
         and Incentive Amounts to Contractor hereunder."

     (b) Article 25 is hereby further amended by inserting the following as new
     Article 25.4 immediately following Article 25.3:

         "25.4 Contractor shall name BCSC as loss payee to the extent of its
         interest under the Ground Insurance maintained with respect to the
         Ground Spare Satellite Bus, as its interest may appear. The Ground
         Insurance maintained with respect to the Ground Spare Satellite Bus
         shall provide, either as a clause in, or an endorsement to, the
         relevant policies, that (i) there shall be no recourse against BCSC,
         the Ground Spare Satellite Bus, this Contract (as it relates to the
         Ground Spare Satellite Bus) or the proceeds of the Ground Insurance for
         payment of premiums or other amounts with respect to the Ground
         Insurance and (ii) the insurers are required to provide BCSC with at
         least thirty (30) Calendar Days (or ten (10) Calendar Days in the case
         of nonpayment of premiums) prior

                                       8

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

         written notice of cancellation or non-renewal of any policy. Such
         policy shall, either as a clause in, or an endorsement to, such
         policy, waive any right of subrogation against BCSC and Customer (and
         their respective officers, employees, agents and insurers). Contractor
         shall provide suitable evidence to BCSC of the Ground Insurance
         maintained with respect to the Ground Spare Satellite Bus.


13.  AMENDMENT OF ARTICLE 11.3 (MAXIMUM EXCUSABLE DELAY; TERMINATION). Article
     11.3 is hereby amended by amending Article 11.3(b) by inserting the phrase
     "and Ground Spare Satellite and related launch services" at the end of the
     parenthetical phrase in the third line thereof, and inserting the following
     as new Article 11.3(c) immediately following Article 11.3(b):

         "(c) In the event of an insurance claim being made with respect to the
         Ground Spare Satellite (prior to the risk of loss transferring to
         Customer) against Ground Insurance, all proceeds shall be distributed,
         and certain other payments shall be made, in accordance with this
         Article 11.3(c) as follows: (i) first, insurance proceeds shall be paid
         to BCSC in satisfaction of the aggregate amount (including principal,
         interest, fees and any other amounts outstanding) owing by Customer to
         BCSC under the Customer Credit Agreement and (ii) then, after BCSC
         shall have accordingly released Customer from any claims from amounts
         owed under the Customer Credit Agreement, Customer shall pay Contractor
         the same amount that was distributed to BCSC (up to the amount owed by
         Customer to BCSC and in accordance with a payment plan to be agreed)
         only in the event Customer does not terminate this Contract with
         respect to the Ground Spare Satellite and related launch services (if
         purchased) under Article 11.3(b) as a result of the event underlying
         such insurance claim and Contractor proceeds to complete the Ground
         Spare Satellite; and (iii) in the event that the Contract is terminated
         under Article 11.3(b) with respect to the Ground Spare Satellite, (x)
         the amount paid to BCSC from the insurance proceeds (under clause (i)
         above) shall be deducted from the refund paid to Customer under Article
         32.4(b) and (y) Contractor shall be reimbursed out of the insurance
         proceeds (to the extent such are available) for all deferred financing,
         milestone payment amounts and Incentive Amounts relating to the Ground
         Spare Satellite, to the extent Customer owes such deferred financing,
         milestone payment amounts and Incentive Amounts to Contractor
         hereunder, and any accrued, but unpaid interest, prior to the
         calculation and payment of any refund to Customer under Article
         32.4(b)."


14.  AMENDMENT OF ARTICLE 28 (LAUNCH SERVICES). Article 28 is hereby amended by
     inserting the following as new Article 28(f) immediately following Article
     28(e):

         "(f) Customer hereby agrees to launch the Ground Spare Satellite using
         Sea Launch at such time as may be agreed by Customer and Contractor, as
         set forth below:

          (1)  The price for said Sea Launch launch services for any launch
               period beginning [***] shall be [***] and the price for
               transportation to the launch site, Sea Launch Launch Campaign,
               Mission Support


                                       9

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

               Services and LEOP for the Ground Spare Satellite shall be [***]
               (notwithstanding Article 30.4, [***]); provided, however, that
               the price for the Sea Launch shall [***] shown in Table 28.1
               below for the [***] which occurs after [***]. The launch
               period shall be as set forth in the applicable Launch
               Agreement, and the aforementioned [***] shall not be imposed
               on the Customer to the extent that the Ground Spare Satellite
               is not Delivered on the applicable Delivery Date due to
               Contractor's fault.

<Table>
<S>                                                                     <C>
         ---------------------------------------------------------------------------------------------
                                   Table 28.1
               Optional Launch Vehicle - Launch Periods and Prices
         ---------------------------------------------------------------------------------------------
         [***]                                                          Price:
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
         [***]                                                          [***]
         ---------------------------------------------------------------------------------------------
</Table>

         (2)  In the event Customer and Contractor have not scheduled a launch
              of the Ground Spare Satellite to occur on or before [***],
              Customer shall have no obligation to launch the Ground Spare

                                       10

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

              Satellite on the Sea Launch and this Article 28(f) shall have no
              further force and effect.

         (3)  Payment terms for the Sea Launch launch services for the Ground
              Spare Satellite shall be as set forth in Table 28.2:

<Table>
<S>                                                             <C>                       <C>
                   -------------------------------------------------------------------------------------------------
                                                              Table 28.2
                                                       Sea Launch Payment Terms
                   -------------------------------------------------------------------------------------------------
                   Payment Date                                 Percentage of Sea         Amount*
                                                                Launch Price
                   -------------------------------------------------------------------------------------------------
                   [***]                                        [***]                     [***]
                   -------------------------------------------------------------------------------------------------
                   [***]                                        [***]                     [***]
                   -------------------------------------------------------------------------------------------------
                   [***]                                        [***]                     [***]
                   -------------------------------------------------------------------------------------------------
                   [***]                                        [***]                     [***]
                   -------------------------------------------------------------------------------------------------
                   [***]                                        [***]                     [***]
                   -------------------------------------------------------------------------------------------------
                   [***]                                        [***]                     [***]
                   -------------------------------------------------------------------------------------------------
</Table>

                   * Assuming a Launch Period commencing [***].

                  The Parties shall make commercially reasonable efforts to
         facilitate, and shall work together to arrange, commercially reasonable
         financing during the construction of the Sea Launch Launch Vehicle from
         a source other than Contractor [***]. Payment terms for the [***] for
         transportation to the launch site, Sea Launch Launch Campaign, Mission
         Support Services and LEOP for the Ground Spare Satellite shall be
         negotiated at time of commitment.

         (4)  In order to establish and secure a launch period, Customer shall
              provide a written notification to Contractor at least [***]
              prior to its desired launch date in order for Contractor
              [***]. Contractor shall work with Customer to obtain [***]
              however Contractor makes no guarantees that such rights can be
              obtained.

         (5)  If [***], the Launch Insurance rate for the launch of the Ground
              Spare Satellite

                                       11

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

              on a Sea Launch Vehicle for launch concurrent with the time of
              the proposed launch of the Ground Spare Satellite [***], the
              insurance rate for launch of [***] (as confirmed in writing by
              Customer's and Contractor's respective insurance brokers), then
              Customer shall have the right, [***] as set forth in this
              Article 28(f). For avoidance of doubt, in the event Customer
              has directed Contractor in writing to proceed with [***]
              (notwithstanding the Launch Insurance rates applicable at the
              time of such written direction), [***], Customer shall not have
              the right to [***] under this Article 28(f)(5).

         (6)  Notwithstanding the foregoing, Customer shall have [***]
              Ground Spare Satellite on Sea Launch in the event of any of the
              following conditions:

              (i)  Sea Launch has a [***] at any given time. In the event
                   that a launch date has been set by Customer and Contractor
                   prior to the [***], Customer shall then have thirty (30)
                   Calendar Days from the date Contractor notifies Customer
                   in writing that [***] to inform Contractor that it will
                   either [***]. In the event Customer does not notify
                   Contractor within this time period, Customer shall [***].
                   In the event no such launch date has been set by Customer
                   and Contractor, Customer shall [***] the Ground Spare
                   Satellite using the Sea Launch as contemplated by this
                   Article 28(f); or

              (ii) Sea Launch has become bankrupt or insolvent or has a
                   receiving order made against it, or seeks the protection of
                   any law relating to bankrupt or insolvent debtors, or if an
                   order is made or resolution passed for the winding up of Sea
                   Launch.

              If a [***] occurs pursuant to the above, Customer shall have
              the right to [***] or negotiate with Contractor to [***] on its
              behalf. In either event, any payments by Customer to Contractor
              for [***] shall either be refunded to Customer within [***] or,
              at Customer's option, [***].

                                       12

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

         (8)      If (i) the Ground Spare Satellite is scheduled to be the
                  [***] at the written direction of Customer for the Ground
                  Spare Satellite, then Customer shall have [***] the Ground
                  Spare Satellite using the Sea Launch as set forth in this
                  Article 28(f).

         (9)      Customer shall have the right to cause Contractor to terminate
                  the applicable Launch Agreement for convenience and Customer
                  shall then pay to Contractor the following termination
                  liability amounts set forth in Table 28.3. In the event that
                  Customer has paid Contractor more than the applicable
                  Termination for Convenience Liability Amounts, such difference
                  shall be refunded to Customer.


<Table>
<S>                                                             <C>
                   -----------------------------------------------------------------------
                                                Table 28.3
                           Sea Launch Termination for Convenience Liability Amounts
                   -----------------------------------------------------------------------
                   [***]                                        [***]
                   -----------------------------------------------------------------------
                   [***]                                        [***]
                   -----------------------------------------------------------------------
                   [***]                                        [***]
                   -----------------------------------------------------------------------
                   [***]                                        [***]
                   -----------------------------------------------------------------------
                   [***]                                        [***]
                   -----------------------------------------------------------------------
</Table>

         (10)     In the event of a [***] the Ground Spare Satellite,
                  Contractor agrees to use reasonable efforts to [***] the
                  Ground Spare Satellite under the terms of the Launch
                  Agreement between Contractor and Sea Launch such that
                  launch of the Ground Spare Satellite is not the [***].
                  Furthermore, Contractor agrees to work jointly with
                  Customer and Sea Launch to negotiate a commercially
                  reasonable accommodation so that Customer shall not be
                  required to [***]. Customer understands that such a [***]
                  may result in a price increase to Customer.

         (11)     Contractor agrees that Customer shall have the same rights of
                  access to Sea Launch LLP as Customer has to Major
                  Subcontractors under Article 6.9 of the Contract and
                  Contractor shall insure that Article 6 applies to Sea Launch
                  L.L.P."


15.  AMENDMENT OF ARTICLE 28 (LAUNCH SERVICES). Article 28 is hereby amended by
     the addition of the following Article 28(g) following Article 28(f):

                                       13

<Page>

***** Certain information on this page has been omitted and filed separately
with the Securities and Exchange Commission. Confidential treatment has been
requested with respect to the omitted portions.

         "(g) Customer shall not propose to have the Ground Spare Satellite
         shipped to the Sea Launch launch processing facility pursuant to
         Article 8.2(h) hereof prior to five (5) days following the repayment in
         full of the loan made by BCSC under the Customer Credit Agreement.


16.  AMENDMENT OF ARTICLE 32.3(a) Article 32.3(a) is hereby amended by adding
     new paragraphs (6) and (7) thereto:

         "(6) If BCSC declares an Event of Default and accelerates Customer's
         payment obligations following such Event of Default under the Customer
         Credit Agreement;

         (7) If a default (permitting termination in whole or in part by
         Contractor) occurs under a satellite purchase contract (relating to any
         portion of the Ground Spare Satellite) between Contractor and an
         Affiliate of Customer, which Affiliate shall be, or shall be controlled
         by, XM Satellite Radio Holdings Inc."

(b) Article 32.4(b) is hereby amended by inserting the following parenthetical
phrase immediately following the phrase "under this Contract" and before the
phrase "and payment of any" in the third line thereof:

         "(or, in the case of partial termination, with respect to the
terminated portion of this Contract)".


17.  AMENDMENT OF ARTICLE 10.1(c). Article 10.1(c) is hereby amended by revising
     the first part of the first sentence to read as follows:

         "(c) In the event Contractor fails to Deliver the Ground Spare
         Satellite on or before the Delivery Date specified in Article 7.1, and
         provided that such late delivery of the Ground Spare Satellite causes a
         delay in the launch of the Ground Spare Satellite, as such date may be
         adjusted in accordance with this Contract, Contractor agrees to pay
         Customer with respect to such Ground Spare Satellite, as liquidated
         damages and not as a penalty, the following amounts for the period
         beginning on the first (1st) day following the Delivery Date specified
         in Article 7.1 and continuing for a period thereafter not to exceed
         [***] (the "Ground Spare Damages Period"):"

18.  AMENDMENT OF EXHIBITS G-1 AND G-2. Exhibits G-1 and G-2 of the Contract
     shall be amended and restated and superseded in their entirety by the new
     exhibits attached hereto as Appendix A and Appendix B, respectively.


                                       14

<Page>


19.  ENTIRE AGREEMENT; COUNTERPARTS. There is no modification to the Contract
     except as expressly set forth in this December Amendment and all terms,
     provisions and conditions of the Contract shall be in full force and
     effect, provided that any provisions in the Contract that are inconsistent
     with this December Amendment shall be construed to be consistent with this
     December Amendment. This December Amendment may be executed in one or more
     counterparts, which together shall constitute a fully executed agreement.

IN WITNESS WHEREOF, the Parties hereto have executed this December Amendment to
the Satellite Purchase Contract No. L0634, effective as of the date first
written above (the "December Amendment Effective Date").

BOEING SATELLITE SYSTEMS            XM SATELLITE RADIO INC.
INTERNATIONAL, INC.


BY:  __________________________     BY:  __________________________



                                       15

<Page>
<Table>
<Caption>

                                                       EXHIBIT G-1
------------------------------------------------------------------------------------------------------------------------------------
                      PAYMENT PLAN FOR BSSI PORTION OF ROLL (PFM (ALSO KNOWN AS XM1)) IN-ORBIT INCENTIVES
------------------------------------------------------------------------------------------------------------------------------------
<S>                                                          <C>
**** Confidential treatment has been requested for this ENTIRE exhibit. The
copy filed herewith omits the information subject to the confidentiality
request. Omissions are designated as [***]. A complete version of this
exhibit has been filed separately with the Securities and Exchange Commission.
</Table>


                    [***Pages 1-4 of Exhibit G-1]

<Page>

                                                             EXHIBIT G-2

**** Confidential treatment has been requested for this ENTIRE exhibit. The
copy filed herewith omits the information subject to the confidentiality
request. Omissions are designated as [***]. A complete version of this
exhibit has been filed separately with the Securities and Exchange Commission.



                    [*** Pages 1-2 of Exhibit G-2]