China-Chongqing-Yudong Block Joint Study Agreement - PetroChina Co. Ltd. and Sunwing Energy Ltd.
JOINT STUDY AGREEMENT BETWEEN PETROCHINA COMPANY LIMITED AND SUNWING ENERGY LTD. TO CONDUCT A JOINT FEASIBILITY STUDY OF THE YUDONG BLOCK IN CHONGQING MUNICIPALITY FOR THE PURPOSES OF ENTERING INTO PRODUCTION SHARING CONTRACTS <PAGE> JOINT STUDY AGREEMENT BETWEEN PETROCHINA COMPANY LIMITED AND SUNWING ENERGY LTD. TO CONDUCT A JOINT FEASIBILITY STUDY OF THE YUDONG BLOCK IN CHONGQING MUNICIPALITY FOR THE PURPOSES OF ENTERING INTO PRODUCTION SHARING CONTRACTS Surwing Energy Ltd. (Sunwing) sent a team of technical experts to visit the Southwest Oil and Gasfield Company in Chengdu, Sichuan (SWOG) in November 2000. SWOG is a subsidiary of PetroChina Company Limited (PetroChina). Technical experts from SWOG presented overviews on the potential of six (6) exploration blocks. After further evaluation of the preliminary data presented to Sunwing, Sunwing has recommended to PetroChina that further detailed study of the Yudong block is required prior to any negotiations of a Production Sharing Contract. Following additional discussion in January and February 2001, PetroChina and Sunwing have agreed to sign this Joint Study Agreement (JSA). ARTICLE 1 - OBJECTIVE Sunwing and PetroChina will form a Joint Study Team (Study Team) and will cooperate diligently to carry out a Joint Feasibility Study (JFS) to confirm the geophysical and geological model of the area, to estimate the ultimate natural gas and oil potential of the area, to evaluate improved drilling technology, to evaluate completion and stimulation solutions to improve gas and oil recovery and establish economic criteria for a potential development. Once this block is approved for foreign cooperation by the relevant department of the Chinese Government, the parties will commence to negotiate a Production Sharing Contract. The Study Team will prepare interim progress reports and a final report recommending either onward work program or no further activity on the block. The purpose of conducting the JFS is to study the natural gas and oil reserve potentials associated with this block and if considered feasible, a Production Sharing Contract would be entered into between PetroChina and Sunwing. ARTICLE 2 - WORK SCHEDULE AND SCOPE OF STUDY AND TECHNICAL REQUIREMENTS 1. Sunwing will send a team of technical experts to the SWOG Chengdu office to review relevant data and will travel to the block to observe and review infrastructure and topography of the area. 1 of 5 <PAGE> 2. Following receipt of the entire data package, Sunwing will sort and catalogue such data as to enable efficient onward retrieval and technical use of the data during the JFS 3. The Study Team will complete the JFS within three (3) months upon finalizing the cataloging of the data package. At the end of the JFS the Study Team will submit the final detail report to PetroChina and Sunwing 4. Main studies and technical requirements During the JFS, the Study Team will prepare a study report which shall include but not be limited to the following: o Identify geological structures with significant exploration prospects by using the available seismic and geological data. This may involve the reprocessing of some of the available seismic data. o Evaluate wells within the block boundaries in order to develop a description of the reservoir and fluid properties that would most likely be encountered in the exploration prospects. o Determine the hydrocarbon in place and reserves for each of the exploration prospects. o Analyze the test data and production data from wells within the block boundaries and develop a production forecast for each prospect. o Evaluate drilling and completion techniques to be employed to best exploit these prospects. o Prepare capital cost estimates for drilling, completion, and facilities, and prepare operating cost estimates. These cost estimates will be used for economic evaluations. o Conduct economic evaluations for each prospect. o Rank the prospects according to the economic parameters and risk. o Prepare a final study report that includes a proposed work program complete with an economic analysis of the program. 5. The data package that PetroChina should provide to Sunwing includes but is not limited to the following data for this block: o Coordinates of proposed block area including exclusion areas for existing gasfields, oilfields and other man made structures o Surface infrastructure map including roads and villages o Bourgeau Anomaly map o Gravity map o Magnetic Anomaly map o Map summarizing exploration activity within the block o Composite columnar cross section to 4500 meters o Topographic maps, current structure maps, basement burial depth maps, current top of reservoir structure maps and surface oilfield facility maps o Geographic and geology maps of existing fields o Map showing location of seismic lines 2 of 5 <PAGE> o Detailed seismic lines including digital data from digitally recorded lines o Seismic cross sections o Complete drilling well histories on each well, including daily reports, bit records, drilling fluids, etc. o Complete electric well log data (in digital form where available) for each well o All core data, representative core samples, core analysis reports and relative permeability data (the samples will be returned after use) o Completion and stimulation data on existing wells o Formation pressure data and temperature data/logs o All water, gas composition analysis o AOF test data and deliverability test data on the existing wells o Copies of existing seismic or geological reports on each block o Statistical data or reports for seismic, geology and drilling 6. Estimated Work schedule following receipt of the complete data package by Sunwing: o Upon receipt of the data package, Sunwing's staff will catalogue all data. o During the next three months, the Study Team will carry out the JFS under terms of the JSA, and will prepare and present a written, final report to PetroChina. The Study Team will also be responsible for preparing an economic evaluation. 7. In order to facilitate the JFS and evaluation, Sunwing should invite at its expense, the following experts (as required) to either its Calgary or Bakersfield off ice: Senior Geologist Senior Geophysicist Senior Reservoir Engineer Senior Log Analyst Senior Drilling Engineer Senior Operations/Production Engineer Senior Economist Translator ARTICLE 3 - RIGHTS AND OBLIGATIONS OF THE PARTIES 1. Based on this agreement, PetroChina's rights and obligations include but are not limited to the following: 1.1. Participate in the JFS as provided for in this agreement. 1.2. Provide assistance to Sunwing to obtain necessary permits and approvals for the JFS. 1.3. Provide or assist to provide necessary and appropriate data pertinent to the JFS, including the data in PetroChina possession or data in the 3 of 5 <PAGE> hands of other government organizations necessary for the JFS if it is available. 1.4. Provide technical experts to help conduct the JFS. Priority is to provide technical experts who will likely participate in this program and the execution phase of the future Production Sharing Contract. 1.5. After the receipt of the Approval from the relevant department of the Chinese government and the results of the JFS have been accepted by PetroChina, both parties will commence negotiations on a Production Sharing Contract as soon as possible. 2. Based on this agreement Sunwing's rights and obligations include but are not limited to the following: 2.1. Sunwing shall pay a data package fee of eighty thousand US Dollars (US$80,000) to CCAD (the official authority in charge of onshore Sino- foreign cooperation as authorized by PetroChina) for data as outlined in Article 2 Clause 5 of this agreement. The payment will be made in three (3) installments. O The first installment forty-five thousand US Dollars (US$45,000) shall be paid within thirty (30) days upon signing of this Agreement. O The second installment fifteen thousand US Dollars (US$l5,000) shall be paid within thirty (30) days upon receipt of the data package. O The third installment twenty thousand US Dollars (US$20,000) shall be paid within thirty (30) days upon expiration of the Study period. 2.2. Apply the appropriate advanced technology as commonly practiced in the international oil community in conducting the Study. 2.3. Provide the necessary technical experts to work on the study. 2.4. Carry out the data analysis and processing as approved in the study plan. 2.5. Bear all costs related to the JFS, including the cost of data acquisition, the costs associated with the business expenses incurred by PetroChina personnel (including international travel and accommodation and travel related expenses) assigned to the Study Team and costs incurred for travel and travel related business expenses for the Study Team while in China, Calgary or Bakersfield. 2.6. Unless otherwise agreed to by the Parties in writing, Sunwing will have the exclusive right to negotiate with PetroChina for a Production Sharing Contract in this block for a period of four (4) months (negotiation period) after the receipt of the Approval from the relevant 4 of 5 <PAGE> department of the Chinese government and the results of the JFS have been accepted by PetroChina. ARTICLE 4 - CONFIDENTIALITY 1. All data provided by PetroChina and/or other government organizations to Sunwing will remain confidential. The data cannot be transferred, presented as gift, sold, published or made public without the written approval from PetroChina or other government organizations. Sunwing will not provide the data to any third party except for consultants hired by Sunwing for the purpose of completing or auditing the JFS and only after they sign a non-disclosure agreement. 2. Without approval from the other party, PetroChina or Sunwing shall not provide the results of this JFS to any third party other than their affiliated companies. 3. The above confidentiality of this agreement will remain effective after the expiration of this agreement. ARTICLE 5 - OTHERS 1. This agreement is under the jurisdiction of the laws of the People's Republic of China. 2. This agreement is written and signed in both Chinese and English, and they have equal force and effect. 3. Contact address of the parties: <TABLE> <S> <C> PetroChina Company Limited Sunwing Energy Ltd. World Tower, #16 Ande Road, Room 1928, China World Trade Dongcheng District Center, #1 Jianguomenwei Dajie, Beijing 100011 Beijing 100004 By: /s/ Zeng Xing Qiu By: /s/ Robert M. Friedland ------------------------------- ----------------------------- Zeng Xing Qiu, Robert M. Friedland, General Manager Co-Chairman Foreign Cooperation Administration Sunwing Energy Ltd. Department PetroChina Company Limited Date: 29/03/2001 Date: 29 March 2001 ----------------------------- --------------------------- </TABLE> 5 of 5